20Gauge
TB Fanatic
In a previous thread, I spoke about using a surveyor to track the lines of my property on the side of some current development. Having gotten the survey, we proceeded to build a 200 ft fence in one section. That was finished before the heat of the summer.
Well, Fall seems to be here, so over the last 3 weeks we have been working on the next section of 300 ft. Yes, 100 yards of new fencing.
Attached are some of the pictures we took.
We still need to wire the fence to the poles and place signs, but in every other respect, the fence is done.
Now we only have 1 section left. That is between the two fences, but that will be next years fence project as this one cost a bundle. We started with poles costing $ 18, but now are $31 each. Yeah same poles and in some cases thinner material as we found with some of the fencing. ( had to use two different vendors for that, no stock in the area )
Enjoy!!
Well, Fall seems to be here, so over the last 3 weeks we have been working on the next section of 300 ft. Yes, 100 yards of new fencing.
Attached are some of the pictures we took.
We still need to wire the fence to the poles and place signs, but in every other respect, the fence is done.
Now we only have 1 section left. That is between the two fences, but that will be next years fence project as this one cost a bundle. We started with poles costing $ 18, but now are $31 each. Yeah same poles and in some cases thinner material as we found with some of the fencing. ( had to use two different vendors for that, no stock in the area )
Enjoy!!